Ponds - Steps
- 1. Ensure a clean, dry surface For Concrete - use Liquid Rubber Concrete Etch. For Wood - use Liquid Rubber Deck Cleaner
- 2. For EPDM Liners, clean with Acetone and use EPDM Primer
- 3. For Concrete, use Liquid Rubber Multi-Purpose Primer
- 4. Bridge joints, seams etc., with Liquid Rubber Seam Tape or Liquid Rubber Geo-Textile
- 5. Build up coats to achieve required thickness.
- 6. COVERAGE - Coverage rates vary by product. See product page for coverage rates.
- 7. Apply the next heavy coat when the product is dry to the touch and nothing is wet underneath.
- 8. Allow to dry 3-5 days before filling
- 9. Fill for 24-48 hrs to water test, drain and wipe clean
- 10. Apply 3-4 heavy coats